Tree surveys › BS5837 tree survey

For planning applications

BS5837 tree surveys for planning

If your planning application involves trees, on the site or close to it, your council will usually ask for a tree survey to BS5837:2012 before it validates or decides the application. We survey the site, grade every tree and produce the report and plans your planning officer expects to see, written in house by our own qualified team, who walk the site in person.

  • ARB Approved Contractor AC2637
  • Constructionline Gold
  • £1m professional indemnity
  • Quotes within one working day

When you need one

  • A householder or full planning application where trees stand on or next to the site
  • Extensions, new builds and driveways within falling distance of a tree
  • Site layouts that need a tree constraints plan before design work starts
  • A condition on an existing permission asking for an arboricultural method statement

What the survey includes

Tree survey schedule

Every relevant tree recorded with species, dimensions, condition and a BS5837 category grading from A to U, so the council can see the quality of what stands on site.

Constraints and protection plans

Root protection areas calculated for each tree, a tree constraints plan for your designer, and a tree protection plan for the construction phase.

Impact assessment and method statement

Where the design affects trees, an arboricultural impact assessment and method statement set out what is affected and how the retained trees are protected during the build.

How it works

  1. Send us the site details. Address, what you are applying for, and any drawings you already have. We quote within one working day.
  2. We survey the site. Our surveyors are local, so visits happen within days, not weeks.
  3. Your report lands ready to submit. Written to BS5837:2012 in the format planning officers ask for, with the plans included.

Independent first. The survey is priced and delivered on its own and its findings are what the trees actually need. If the report recommends work, you are free to take it to any contractor you like. Because we are also an ARB Approved Contractor, we can carry out that work ourselves if you choose, one firm from survey to sign-off, but the report never depends on it.

Questions we are asked about BS5837 surveys

Do I need a BS5837 survey for a house extension?

If trees stand on or near the part of the site you are building on, your council will usually ask for one before it decides the application. Checking the validation requirements on your council's planning pages, or asking us, settles it quickly.

How long does the survey take?

Most residential sites are surveyed in a single visit. Because our surveyors are local to Lancashire, we can usually be on site within days, and we quote within one working day.

What do the A, B, C and U categories mean?

BS5837 grades each tree by quality and how long it can be expected to contribute: A for high quality, B for moderate, C for low, and U for trees that cannot realistically be retained. The grading tells the council which trees carry weight in the planning balance.

Is the report accepted by my council?

The report is written to BS5837:2012, which is the standard planning authorities across Lancashire and the North West ask for. It sets out the survey schedule, plans and assessments in the format planning officers expect.

What if a tree on the site is protected?

Protected trees are recorded in the survey and handled through the planning process. If you want to know before you start, our free protected tree checker gives you an indicative answer in seconds.

From survey to site supervision

One team can carry the trees through the whole scheme, from the first constraints plan to the last condition being signed off. Depending on the scheme, that can mean a simple arboricultural report for a householder application or the full BS5837 package for a commercial one.

StageDeliverableWhat it does
FeasibilityTree survey and constraints planRoot protection areas and constraints early, to inform the layout before design work hardens
PlanningArboricultural impact assessmentExplains removals, pruning and mitigation for the planning officer
PlanningTree protection planProtective fencing, ground protection and access, drawn to scale
Pre-startArboricultural method statementStep by step methods for works near trees, to discharge conditions and brief contractors
ConstructionSite supervision and monitoringInspection notes during the build that keep works compliant and conditions satisfied

Plans are issued as PDFs with CAD layers your architect or designer can drop straight into the drawing set.

Start with a free scope check

Tell us about your site and application and we will tell you exactly which survey you need, with a quote within one working day.

The documents that build on the survey

The BS5837 survey is the foundation; the council may then ask for documents built on it as the application progresses. The tree constraints plan is the drawing your architect overlays on the design. The arboricultural impact assessment weighs the finished design against the trees. The arboricultural method statement sets out how work happens safely near them. All three build on the same survey visit, so nothing is started twice.

Surveying for a site in the city? See BS5837 tree surveys in Preston; for the rest of the county, tree surveys across Lancashire.