Tree Planting Done Properly

Practical Tree Planting in the North West

If you want trees that thrive, not just survive, the work starts before a spade goes in the ground. We match species to the site, prepare the soil, plant to BS8545, then look after new trees so they establish well. Great Oaks delivers tree planting across Preston, Lancashire and the North West for developers, housing, schools, utilities and public realm projects. You get clear plans, tidy sites and simple aftercare that keeps everything on track. 

Autumn leaves and trees in a park in Preston

Your Options at a Glance

Aim 

Best fit 

What we install 

Where it works well 

What you see in year 1 

Make an entrance look finished 

Semi-mature impact 

Heavy standards with anchors, irrigation and mulch 

Car parks, plazas, main approaches 

Instant structure and shade lines forming 

Grow canopy on a budget 

Coverage at scale 

Whips and transplants with guards and mulch 

Estates, boundaries, open space 

Fast numbers in the ground, low unit cost 

Screen and support biodiversity 

Living boundaries 

Mixed native hedgerow in staggered rows 

Schools, housing edges, utilities 

Early screening and strong habitat value 

Create woodland 

Long-term canopy 

Native woodland mix with spacing and shelters 

Larger parcels, mitigation land 

Early take with simple maintenance route 

Plant in paving 

Trees in hard landscapes 

Engineered pits, soil cells, root barriers and aeration 

Streets, car parks, courtyards 

Healthy trees despite tight urban conditions 

How We Make Tree Planting Work

We begin with the purpose of the planting. Screening, shade, habitat or a quick visual lift each need a different approach. Soil and access come next. If ground is compacted, we decompact and improve it. In paved areas we install proper pits with anchors, irrigation and barrier controls so roots and hard surfaces can live side by side. Protection matters too. Stakes or below-ground anchors, guards and clean mulch rings keep young trees safe from wind, strimmers and mowers. 

Aftercare is planned upfront. Watering, weed control and a first formative prune help trees set strong structure. You receive a simple schedule and photo reports so you can see progress without chasing. 

What’s Included

  • Site assessment and species list that suits space, soil and future maintenance 
  • Supply of quality nursery stock in sizes that fit your budget and programme 
  • Correct pit preparation, planting to BS8545, anchoring and tidy mulch rings 
  • Protection with guards or shelters and rabbit proofing where needed 
  • Watering and weed control plan with clear visit frequencies 
  • Digital handover with planting schedule, locations and photos 

Planning, BNG and Protected Sites

We support planning conditions and Biodiversity Net Gain targets with straightforward documentation. Where new planting sits alongside retained trees, we align with BS5837 so protection and installation do not clash. If a site includes conservation areas or TPOs, we complete the checks and produce method statements. 

Speak To Us Today

Get in touch with Great Oaks today. We’re happy to answer any questions relating to arboriculture or grounds maintenance, or provide further info about our chainsaw courses.

A Simple Delivery Path

  1. Brief agreed with budget and dates
  2. Site visit and planting plan
  3. Ground prep and installation
  4. Handover with photos and locations
  5. Aftercare visits through the first seasons

Aftercare that Keeps Trees Growing

Watering in dry spells, weed control, mulch top-ups and light formative pruning make the difference between average and excellent establishment. We set out a sensible programme and stick to it. If replacements are needed within a fair defects period, we handle them quickly.

FAQs

Do you plant semi-mature trees as well as whips? 
Yes. From 60–90 cm whips to semi-mature trees for instant impact. 

Can you plant in car parks or paved areas? 
Yes. We use engineered tree pits with anchors, aeration and root barriers. 

How long does aftercare run? 
Most schemes run for 12 to 24 months with agreed watering and checks. 

Can you help with BNG evidence? 
We provide simple records and planting schedules you can submit to your local authority. 

Plan Your Tree Planting

Great Oaks Tree Services. Planting that looks good now and grows better every year.

📞07884 274693
✉️ office@greatoakstreeservices.co.uk
🌐 Contact us online